Founder Notes
Insurance-Shaped Data
There is a class of engineering work that is chronically underbuilt, and I do not think the reason is negligence. I think the incentives are genuinely against it on every individual day.
Call it insurance-shaped data. It is worth nothing on any ordinary Tuesday, and then it is worth everything on one day that is not on your calendar.
The concrete case
Lot-level movement records. Which lot, received when, from which supplier, distributed to which location, sold across which dates.
On a normal day that record earns you nothing. It does not improve a metric anybody reports. It does not close a deal. Building it is pure cost, and maintaining it is pure friction imposed on people who receive no benefit from the friction.
So it does not get built. Not through carelessness — through an entirely rational reading of the incentives visible on any given day.
Then one lot has to come off the shelf.
And the question is not whether you can pull it from the shelf in front of you. That part is easy. The question is whether you can say where the rest of it went.
The property that makes it different
You cannot build it retroactively.
This is what separates insurance-shaped data from most technical debt. Ordinary debt can be paid down later, more expensively. This cannot. The information was either captured as things moved, or it was not. On the day you need it, urgency buys you nothing, because there is nothing to accelerate.
That asymmetry is worth naming explicitly, because it is the whole argument. "We'll do it later" is a coherent position for most work and an incoherent one here.
Why it loses prioritisation arguments
Expected value is genuinely high. Daily observed value is genuinely zero. Teams optimise on what they can observe, and no dashboard will ever show the value of a record that has not been needed yet.
Worse, the people who would have to maintain it are not the people who would benefit. The person scanning a lot number at receiving gets nothing from doing it accurately. The benefit accrues months later, to someone else, under circumstances nobody is thinking about.
What I have found actually works
Not persuasion. Persuasion has to be repeated, and it decays.
The only durable version is making capture a side effect of something people already have to do. If recording lot movement is a separate step, it will degrade — not immediately, but steadily, and invisibly, right up until you query it and find out how long it has been degrading.
If it is a byproduct of receiving goods, it survives.
The general form: for insurance-shaped data, do not design the capture step. Design the thing people are already doing so that capture falls out of it.